Impact scenario / Matting & mobilization

Move the package.
Understand the tradeoff.

A worksheet for project managers weighing a second mobilization against transferring mats or equipment between jobs.

User-entered assumptions · USD
01 / Project context

Start with the evidence.

Changing the pair opens a fresh worksheet. Up to 100 pairs from the active dataset are listed.

No pair attached. Use this worksheet for your own two-job scenario, or choose a pair to keep its source evidence alongside your assumptions.

02 / User scenario

Is another mobilization worth avoiding?

Compare avoided mobilization costs against the extra cost of moving and holding a package between jobs. Enter your own quotes and assumptions. Blank means unknown; enter 0 when a cost does not apply.

Package description: None entered.

Avoided mobilizations × quoted cost per move − additional coordination cost

Holding costs are excluded. Enable them if keeping the package between jobs creates additional charges.

Low

User assumptions
Modeled potential · USDNot calculatedComplete the inputs below.
Complete moves you assume can be avoided. Use the same scope as the quote below.
Freight and mobilization costs actually avoided per move; exclude costs still incurred.
Total extra inter-site freight, handling, cleaning, inspection and administration. Exclude holding costs below.

3 required inputs remaining.

Base

User assumptions
Modeled potential · USDNot calculatedComplete the inputs below.
Complete moves you assume can be avoided. Use the same scope as the quote below.
Freight and mobilization costs actually avoided per move; exclude costs still incurred.
Total extra inter-site freight, handling, cleaning, inspection and administration. Exclude holding costs below.

3 required inputs remaining.

High

User assumptions
Modeled potential · USDNot calculatedComplete the inputs below.
Complete moves you assume can be avoided. Use the same scope as the quote below.
Freight and mobilization costs actually avoided per move; exclude costs still incurred.
Total extra inter-site freight, handling, cleaning, inspection and administration. Exclude holding costs below.

3 required inputs remaining.

Modeled potential, not realized savings. These scenarios are user assumptions, not bids, supplier rates or predictions. Only costs that actually disappear belong in the avoided amount.

03 / Milestone assumption

What if the filed milestones moved?

Enter two hypothetical in-service dates to compare their gap. They do not change the published records or calculate rental days. In-service milestones do not establish construction or equipment availability.

Assumed gapUnknown
04 / Prepare the conversation

Bring the assumptions with you.

Standalone scenario: no project pair attached. Your entries stay in this page and are cleared on reload. Print or save a PDF to keep a copy.

Quote references and open questions: None entered.

Confirm before treating this as a coordination opportunity

For timber mats, ask about soil conditions, deployment duration and inspection requirements. This worksheet does not estimate decay or select a safe mat material.