Move the package.
Understand the tradeoff.
A worksheet for project managers weighing a second mobilization against transferring mats or equipment between jobs.
User-entered assumptions · USDStart with the evidence.
Changing the pair opens a fresh worksheet. Up to 100 pairs from the active dataset are listed.
No pair attached. Use this worksheet for your own two-job scenario, or choose a pair to keep its source evidence alongside your assumptions.
Is another mobilization worth avoiding?
Compare avoided mobilization costs against the extra cost of moving and holding a package between jobs. Enter your own quotes and assumptions. Blank means unknown; enter 0 when a cost does not apply.
Package description: None entered.
Avoided mobilizations × quoted cost per move − additional coordination cost
Holding costs are excluded. Enable them if keeping the package between jobs creates additional charges.
Low
User assumptions3 required inputs remaining.
Base
User assumptions3 required inputs remaining.
High
User assumptions3 required inputs remaining.
Modeled potential, not realized savings. These scenarios are user assumptions, not bids, supplier rates or predictions. Only costs that actually disappear belong in the avoided amount.
What if the filed milestones moved?
Enter two hypothetical in-service dates to compare their gap. They do not change the published records or calculate rental days. In-service milestones do not establish construction or equipment availability.
Bring the assumptions with you.
Standalone scenario: no project pair attached. Your entries stay in this page and are cleared on reload. Print or save a PDF to keep a copy.
Quote references and open questions: None entered.
For timber mats, ask about soil conditions, deployment duration and inspection requirements. This worksheet does not estimate decay or select a safe mat material.