Jasper – Okatie 230 kV #2: Construct
Dominion Energy SCFiled in-service: 5/31/2026 · precision: day
Source: DESC Planned Transmission Projects $2M and Above Total - 2025-2029 · page 18
Open source document ↗A worksheet for project managers weighing a second mobilization against transferring mats or equipment between jobs.
User-entered assumptions · USDChanging the pair opens a fresh worksheet. Up to 100 pairs from the active dataset are listed.
Filed in-service: 5/31/2026 · precision: day
Source: DESC Planned Transmission Projects $2M and Above Total - 2025-2029 · page 18
Open source document ↗Filed in-service: 6/1/2027 · precision: day
Source: 2025 IRP Technical Appendix Volume 3 - Transmission Plan - Public Disclosure · page 183
This pair was rejected in review. Its costs can be explored hypothetically, but it is not a validated coordination opportunity. Center distance is not a truck route. Filed in-service dates are not construction windows.
Inspect pair evidence and review details →Compare avoided mobilization costs against the extra cost of moving and holding a package between jobs. Enter your own quotes and assumptions. Blank means unknown; enter 0 when a cost does not apply.
Package description: None entered.
Avoided mobilizations × quoted cost per move − additional coordination cost
Holding costs are excluded. Enable them if keeping the package between jobs creates additional charges.
3 required inputs remaining.
3 required inputs remaining.
3 required inputs remaining.
Modeled potential, not realized savings. These scenarios are user assumptions, not bids, supplier rates or predictions. Only costs that actually disappear belong in the avoided amount.
Enter two hypothetical in-service dates to compare their gap. They do not change the published records or calculate rental days. In-service milestones do not establish construction or equipment availability.
Scenario context: Jasper – Okatie 230 kV #2: Construct / SAV: GOSHEN (SAV) - KRAFT 115KV LINE REBUILD. Your entries stay in this page and are cleared on reload. Print or save a PDF to keep a copy.
Quote references and open questions: None entered.
For timber mats, ask about soil conditions, deployment duration and inspection requirements. This worksheet does not estimate decay or select a safe mat material.